National Stadium

This project was installed on an incredibly short timescale. We had a 40 hour window to complete all the works to ensure the client could prepare for a high profile event.

Project Details 

The project began with the removal of the existing carpet, which had been adhered directly to the subfloor. Once uplifted, we carried out comprehensive preparation works to ensure the subfloor was clean, level, and smooth, allowing for the successful application of the tackifier adhesive.

The carpet tiles were installed in a bespoke layout, creating a dynamic design that maintains a consistent pattern from every viewing angle. The entire project was completed within a 32-hour timeframe, providing the client with ample time to prepare for their upcoming event.

The client was extremely pleased with the outcome, and we have since been invited back on multiple occasions to deliver additional projects.

Project Fact

TIMEFRAME

32 Hours