Project DetailsÂ
The project began with the removal of the existing carpet, which had been adhered directly to the subfloor. Once uplifted, we carried out comprehensive preparation works to ensure the subfloor was clean, level, and smooth, allowing for the successful application of the tackifier adhesive.
The carpet tiles were installed in a bespoke layout, creating a dynamic design that maintains a consistent pattern from every viewing angle. The entire project was completed within a 32-hour timeframe, providing the client with ample time to prepare for their upcoming event.
The client was extremely pleased with the outcome, and we have since been invited back on multiple occasions to deliver additional projects.
Project Fact
TIMEFRAME
32 Hours
Browse our other case studies