New Build Sixth Form Centre

For this project we completed a new build sixth form centre of 800m2 which included classrooms, corridors, toilet facilities and breakout areas.

Project Details 

A bespoke herringbone floor design was installed within the breakout areas using Interface carpet tiles, creating a strong focal point within the sixth form centre. The distinctive layout adds texture and movement while maintaining a calm, welcoming atmosphere for students.

 

The herringbone pattern allowed us to move beyond a standard installation, requiring precision and attention to detail to achieve a fully customised finish. The soft, neutral tones of the carpet tiles help balance the bold design, ensuring the space feels both modern and comfortable.

 

Working closely with the wider project team, we delivered flooring solutions that balance durability, safety, and design. The finished space supports both study and social use, providing a practical yet inspiring environment for students and staff.

See What We Can Build For You

Project Fact

SCALE

800m2

which included classrooms

MATERIALS

Interface Carpet Tiles

TIMEFRAME

4 Weeks

Browse our other case studies